Display:
Phone
Tablet
Small Desktop
Large Desktop

Taylor Lane Timber Frame

Rotherwas Industrial Estate, Hereford
1 reviews
0
0
1

Write a review for Taylor Lane Timber Frame

You can post a review for this company here. Please note that all reviews are subject to moderation before publication and we may, at any time, ask you to provide evidence to support your comments.

Drop Files here to upload or click to select.
Include proof of enquiry, proof of purchase, copies of correspondence, and/or photographic evidence to have your review verified.
Your details will NOT be used for marketing purposes or sent to any third party.
By submitting this form, you are agreeing that you have read and understand our Terms and Conditions.

Reviews

We do not monitor this company's feedback so the reviews on this page may not be genuine.
Only reviews that have been verified by us should be relied on.

April 2023
Taylor Lane – Wooden Frame supply First Survey TL contractors sent – the ground workers noticed that the survey was incorrect and the footings were not aligned with the existing barn Second Survey The same people sent from TL following my/groundworkers/architect concerns about the first survey who were filmed kicking the posts and strings to realign the first survey outlines Cancelled concrete pour due to 2nd incorrect survey causing 6 week delay and extra concrete costs due to larger than needed footings from incorrect surveys Independent company bought in for correction survey finds 238 mm orientation mistake (£600 cost) and further delays Construction mistakes: - North Wall:- All 3 arrow slit windows are double the correct size from the plans Door frame 100 mm to small in height (needing corrections) East Wall 2500 mm to big and needed to be reconstructed so that it fit with South wall (2 days work) West Wall Both downstairs windows are different sizes (heights) – they should have been the same – steel girder drilled in the wrong place (TL had to correct this) The Bathroom wall not constructed/supplied at all Unable to construct the frame in the time frame needed (due to incorrect survey) so had to get others to do this at a significant extra cost above and beyond the TL quote (The TL offer to construct was months to late on top of the survey delay) Lintels not costed or provided – only told they would not be supplied in January 2023 Internal wall Supports Two of the internal walls were out of alignment to footings measurements First Survey TL contractors sent – the ground workers noticed that the survey was incorrect and the footings were not aligned with the existing barn so footings were stopped Second Survey The same people sent from TL following my/groundworkers/architect concerns about the first survey who were filmed kicking the posts and strings to realign the first survey outlines Cancelled concrete pour (again) due to 2nd incorrect survey causing 6 week delay and extra concrete costs due to larger than needed footings from incorrect surveys £££ Independent company bought in for correction survey finds 238 mm orientation mistake (£600 cost) and further delays (TL said there tolerances were 5mm otherwise they would not construct) Construction mistakes: - North Wall:- All 3 arrow slit windows are double the correct size as shown on the plans. Door frame 100 mm to small in height (needing corrections) East Wall :- 2500 mm to big and needed to be reconstructed so that it fit with South wall (2 days work) West Wall:- Both downstairs windows are different sizes (heights) – they should have been the same – steel girder drilled in the wrong place (TL had to correct this) The Bathroom wall not constructed/supplied at all Taylor Lane said they were unable to construct the frame in the time frame needed (due to incorrect survey) so had to get others to do this at a significant extra cost above and beyond the TL quote (The TL offer to construct was months to late on top of the survey delay) Internal wall Supports were out of alignment to footings measurements Lintels not costed or provided – only told they would not be supplied in January 2023 Taylor caused the loss of scheduled contractors due to the delays caused - the project is now 6 months late and £25k over budget due to their incompetence and duplicities . I have an invoice but your proof of purchase box will not upload or allow me to copy/paste?

Report this review

If you think this review is a hoax, malicious or unfair, please report it for investigation